SCDOT West Georgia Rd over Reedy River
Construction of 180’ long by 64’ wide single span steel girder bridge. ½ mile roadway realignment with 34,650 CY of unclassified excavation and 4,000 CY of borrow material along with associated storm drainage and utility work.